Chennai
Villa Green - Elevation Photo
Verified Listing

Villa Green

Kelambakkam, OMR, Chennai. On Thaiyur Road
Property Type: 3, 4, 3.5 BHK Villas/Homes, 2 BHK Row Houses
Possession: Ready To Move
PRICE ON REQUEST
Banks Associated with Villa Green
Legal Information of Villa Green
Price Trends
Price Trend for last 6 months
Neighbourhood of Villa Green
Amenities of Villa Green
Security
Power Backup
Car Parking
Children's Play Area
Gym
Rainwater Harvesting
Swimming Pool
Clubhouse
Overview of Villa Green

Villa Green gives you all the space and scope that you would ever want to pamper yourself. No matter what the weather is like in the city, the open spaces and ample greenery will keep your villa cool through the hottest days and when you feel like stepping outdoors, get set to enjoy the luxury of space - All 60 acres of it.
Project is located in between GST Road and OMR (Old Mahabalipuram Road). Villas will be ready for possession in six months from the date of registration
Limited edition plots in the same gated community.Plot size ranging from 600- 2400 Sq.ft.Villa Plots starts from 10.50 L onwards.

Specification of Villa Green

SPECIFICATIONS

Structure:

 R.C.C framed structure with 200mm concrete block walls using first quality materials, designed for seismic resistance.

 

Joineries:

 Main door:

 Teak wood frames with OST flush door, front side varnished shutter, back side painted with branded locks.

Other doors:

 Hard wood / Sal wood frame with flush door shutter painted on both the sides.

 

Flooring:

 Johnson or equivalent make vitrified tile flooring in floor area of the apartment i.e. living, dining, bedrooms,  kitchen and walkways.

 Balconies and sit-outs would be laid with ceramic Tiles or terracotta finished tiles.

 Glazed ceramic tiles will be fitted in toilet walls and anti-skid tiles would be laid in toilet floor and service areas.

 Toilet walls shall be finished with glazed tiles upto a height of 7' feet on walls.

 

Windows:

 UPVC windows will be fixed with MS Grills and 4mm clear glass or pinhead glass.

 Suitable tower bolts and hinges shall also be fixed.

 

Electrical:

 Using ISI quality copper cables wiring through PVC conduits concealed in walls and ceiling.

 

Electrical points:

 Fan point Light point15 - AMP point5 - AMP point TV & Tel.

 Foyer-1-Living12-21 each Dining111 - Fridge1- Master Bedroom12A/C21 each Other Bedrooms12A/C1-

 Kitchen-1-1 - Mixie-Utility-11 - Grinder 1 Washing machine- Bathrooms-11 (Geyser)1 - Exhaust- 

 Three phase connection with independent meter.

View More
Builder
Live Projects

The projects promoted and developed are self-dependent and through internal accruals. Greenhome's projects are open to public only after obtaining necessary, pertinent and valid government and legal approval. High priority is given for customer satisfac- tion and towards enabling transparent operational procedure. Commitment and timely delivery are concomitant to this process. Greenhome assures value for money and satisfying returns to the customers on their investments. Greenhome is safe, inspiring and promising investment destination. The most rewarding experience is the good will, confidence and the repeated patronage from our esteemed clientele.A strong and ever growing customer base of over 10,000 satisfied clientele, have further raised the bar to value our commitment. And our belief remains firm in creating spaces.

View More