KB's Steps Flats - Elevation Photo

KB's Steps Flats

Chromepet Chennai. Near 50 Meter From Hasthinapuram Bus Stop.
Property Type: 1 BHK Apartments
Possession: Ready To Move
27.49L
5100+ /SqFt
Legal Information of KB's Steps Flats
Price Trends
Price Trend for last 6 months
Neighbourhood of KB's Steps Flats
  • Schools
  • Hospitals
  • Bus
  • Train
  • Malls
  • Parks
marker

How Far is KB's Steps Flats?

Amenities of KB's Steps Flats
Lift
Car Parking
Rainwater Harvesting
Vaastu Compliant
Overview of KB's Steps Flats

KB's Steps Flats is a residential project in chennai.


Additional Charges: Car Parking, EB, Registration, Service Tax, etc.

Near by Locations:
100 Mtr From Murugan Temple
100 Mtr From Canara Bank
100 Mtr From Mosque
2.5km From Chrompet Railway Station
Near by Deepam Hospital
Near by NSN CBSC School
Near Saravana Store & Vaishnava College

 

Specification of KB's Steps Flats

SPECIFICATION
Foundation RCC column foundation
Structure
RCC framed structure for seismic condition. The InfiII walls Finished with brick worktplastered on both sides.

Anti Termite
By pest Control

Car Parking
All covered car parking

Doors & windows
Main door with teak wood frame factory made flush shutter with veneer finish, all other doors are fattory Made frames and solid core skin door/shutters. Windows and French doors are finished with/LIPVC window shutters with 4mm to 5mm clear glass/pinheaded and quality hardware fixtures.

Loft
Above The Wardrobe And Kitchen

Floor finishing
Living&dining passages, kitchen, all bed rooms, service &bakony are finished with 70x70 Johnson vitrified tiles for flooring.

Wall tiles
18'x16" ceramic tiles for toilets up tor height 18x16' ceramic tiles for kittchen up to 2' height above the kitchen counter.

Kitchen
2"0" pre plashed granite counter will be provided with diamond stainless steel first quality sink

Electrical
Installations Three phase electrical main supply with ISI copper veidng and modular range of electrical switches and provision for inverter.

Plumbing & sanitary
2"0" pre polished granite counter will be provided with diamond stainless steel first quality sink.Water lines are connected and distributed by truebore fitting water pipes and the waste water (soil lines are conveyed through PVC pipes, parryware or equivalent range of washroom and sanitary fittings. Overhead vster tank of 5000 LitrestAppnx)for6 Flats.

Painting
Interior walls are finished with emulsion paint with putty, Ceiling area finished with emulsion paint and the Exterior walls are painted with exterior emulsion.

Lift
Lift for 2 floors

View More
RoofandFloor

Do you constantly receive calls for properties that are not even relevant to you?

Get personalized recommendations - on the go!